Tavanab Seneh; Two decades of experience in implementing the country’s construction and infrastructure projects
Water transmission and management: implementation of pipelines, canals, pumping stations, and electrical and mechanical equipment
Pressurized systems, valve chambers, measurement and control systems
Water transmission and management: construction of pipelines, canals, pumping stations, and electrical and mechanical equipment
Construction of pipelines, canals, pumping stations, and electrical and mechanical equipment
Water and Wastewater Networks
Design and construction of treatment plants and storage reservoirs
Construction and installation of various structures and related equipment
Design and construction of treatment plants and storage reservoirs
Technical Knowledge Transfer
Contract Duration: 12 months
Contract Number and Date: 4379 dated 8/4/1400
Land Handover Date: 4/5/1400
Main Activities Include:
Excavation and Pipeline Installation
Procurement and Installation of Fittings, Accessories, and Valves
Construction of Concrete Chambers
Construction of Pumping Station
Procurement and Installation of Mechanical and Electrical Systems of the Pumping Station
Repair of Concrete Reservoir and Miscellaneous Works
Work Percentages Based on Contract Appendices:
Buildings List: 5.9%
Water Transmission Lines List: 10%
Mechanical Installations List: 5.3%
Electrical Installations List: 8%
Water Distribution Network List: 66%
Rural Water Transmission and Distribution List: 3%
Physical Progress: 100%
Status: Final Delivery
Contract Duration: 12 months
Contract Number and Date: 11711/73/1404 dated 25/3/1404
Land Handover Date: 7/4/1404
Main Activities Include:
Earthworks
Concrete Pouring
Asphalt Paving
Work Percentage Based on Contract Appendices:
Road, Railway, and Airport Runway List: 100%
Physical Progress: 10%
Status: In progress
Contract Title: Completion of Hakim River Regulation in Bijar City
Contract Amount: 19,650,838,708.5 IRR
Contract Duration: 12 months
Contract Number and Date: 2404000137000002 dated 26 May 2025 (5/3/1404 in Persian calendar)
Land Delivery Date: 17 June 2025 (28/3/1404 in Persian calendar)
Main Activities Include:
Excavation
Sludge removal
Completion of previous masonry walls
Construction of new walls
Work Percentage Based on the Attached Contract Schedules:
Structures Schedule: 100%
Physical Progress: 35%
Status: In Progress
Contract Amount:
264,575,758,713 IRR
Contract Duration:
9 months
Contract Number and Date:
4305/140/1402 dated August 10, 2023 (19/5/1402 in the Persian calendar)
Site Handover Date:
August 17, 2023 (26/5/1402 in the Persian calendar)
Main Activities Include:
Completion of remaining works on the dam crest
Site development and installation of lighting systems on the dam crest and surrounding area
Completion of permanent buildings including guesthouses and operational facilities
Execution of surveying pillars (micro-geodesy)
River regulation and downstream spillway works
Supply and commissioning of communication systems
Execution and completion of remaining hydromechanical and electrical dam works
Installation of fencing around the dam area and buildings
Work Distribution Based on the Contract’s Attached Bill of Quantities:
Building and structural works: 70.5%
Roads, railways, and airport runways: 13.5%
Mechanical installations: 2.5%
Electrical installations: 1.3%
Dam construction works: 9.5%
Physical Progress:
98%
Status:
At Provisional Acceptance Stage (Temporary Handover)
Contract Duration:
12 months
Contract Number and Date:
26/1/37 dated July 31, 2024 (10/5/1403 in the Persian calendar)
Site Handover Date:
August 4, 2024 (14/5/1403 in the Persian calendar)
Main Activities Include:
Pipeline installation
Supply and installation of fittings, accessories, and valves
Construction of concrete chambers
Completion of the pumping station
Supply and installation of mechanical and electrical systems for the pumping station
Work Distribution Based on the Contract’s Attached Bill of Quantities:
Building and structural works: 17%
Water transmission lines: 16%
Mechanical installations: 6%
Electrical installations: 8%
Pressurized irrigation: 53%
Physical Progress:
85%
Status:
In Progress
Contract Title:
Execution of Remaining Works for the Main Irrigation and Drainage Network of Abkhor Garan Dam Lands Related to Civil Units 1 and 2, Including Reservoirs, Pumping Station, and Class 1 & 2 Pipelines and Technical Structures
Contract Duration:
6 months
Contract Number and Date:
5263/140/99 dated September 2, 2020 (12/6/99 in the Persian calendar)
Site Handover Date:
September 23, 2020 (2/7/1399 in the Persian calendar)
Main Activities Include:
This operation encompasses a set of construction and equipment works including:
Execution and completion of the remaining works for the main irrigation and drainage network of Abkhor Garan Dam lands
Completion of reservoirs
Completion of all civil, mechanical, and electrical works of Selsi Olya Pumping Station
Execution of remaining works for Class 1 and 2 pipelines along with technical structures in Civil Units 1 and 2
Work Distribution Based on the Contract’s Attached Bill of Quantities:
Building and structural works: 2%
Roads, railways, and airport runways: 16%
Mechanical installations: 2%
Electrical installations: 10%
Irrigation and drainage: 6%
Power distribution: 3%
Physical Progress:
100%
Status:
Provisional Acceptance (Temporary Handover)
Over 20 years of experience in implementing construction and infrastructure projects across the country
Official and accredited rankings: Grade 4 in Water and Grade 5 in Buildings and Roads
A specialized and experienced team of engineers, experts, and professional field staff
Commitment to quality and compliance with national and international standards at all project stages
A wide range of services, from water transmission and irrigation networks to building construction, roadworks, and treatment plants
Provision of specialized equipment for seamless and complete project execution
Commitment to time and budget: delivering projects with strict adherence to schedules and allocated costs
Innovation and a forward-looking approach in designing and implementing sustainable infrastructure