Contract Title:
Construction Operations for a 5,000 Cubic Meter Raw Water Reservoir and Perimeter Fencing (Wall Construction) of the Potable Water Treatment Plant No. 2 Site – Baneh City
Contract Duration:
12 months
Contract Number and Date:
1499/140/1401 dated May 28, 2022 (7/3/1401 in the Persian calendar)
Site Handover Date:
May 24, 2022 (3/3/1401 in the Persian calendar)
Main Activities Include:
Construction of a 5,000 m³ concrete reservoir and associated site development
Perimeter wall construction, site grading, and related earthworks
Construction and equipping of inlet, outlet, and overflow chambers
Work Distribution Based on the Contract’s Attached Bill of Quantities:
Building and structural works: 87%
Water transmission lines: 10%
Wastewater collection and transmission network: 3%
Physical Progress:
100%
Status:
Provisional Acceptance (Temporary Handover)